Skip to main content

Fleet

4-Axle Lowbed Trailer

When the machine is too heavy for a standard lowbed, the fourth axle spreads the load. Decent Way runs 4-axle lowbeds from Musaffah for heavy plant and project cargo — with CICPA-passed drivers, permit and escort handling, and rigging support for the lift.

Typical payload
60–80 t Typical payload
Typical deck height
0.85–1.0 m Typical deck height
GPS-tracked fleet
IVMS GPS-tracked fleet
White four-axle lowbed trailer from the Decent Way fleet

Approved, cleared & compliant

  • CICPA — Critical Infrastructure and Coastal Protection Authority
  • Abu Dhabi Civil Defence Authority

Specifications

Usable well length
Typically 8–10 m of well, sized for heavy crawler plant and dense project cargo
Overall length
Typically 12–16 m overall, with the extra axle group under the load
Deck width
Typically 2.5–3.0 m; wider heavy plant moves under permit
Deck height
Typically 0.85–1.0 m — low enough for tall, heavy machines to travel legally
Axles
4
Payload
Typically 60–80 t (configuration-dependent)
Axle loading
Fourth axle spreads weight to meet UAE axle-load limits
Oversized loads
Overweight and oversize project moves run under permit with escort vehicles
Tracking
IVMS GPS on every unit

Hire options

With Driver (wet hire)

Supplied with a CICPA-passed, ADSD-certified driver experienced in heavy-plant haulage. Fuel, maintenance and insurance are on Decent Way, and every move is dispatch-managed and IVMS-monitored.

Without Driver (dry hire)

Trailer-only hire under a signed hire agreement. Operation, loading and site liability rest with the hirer, and a handover inspection is documented at delivery and return.

Quote-only — send your requirement through the form or call our dispatch desk.

What moves on a 4-axle lowbed

The 4-axle lowbed takes the loads that sit above a standard 3-axle unit: heavier machines, denser skids and project cargo that needs its weight spread across more tyres before it can travel.

  • Heavy excavators, dozers and crawler plant
  • Crane components and counterweights
  • Piling rigs and drilling-support equipment
  • Transformers, E-houses and heavy skids
  • Oversized project cargo under permit

Axle loads, permits and escorts

The fourth axle exists for one reason: spreading gross weight so each axle group stays inside UAE axle-load limits. Standard combinations are capped at 45, 56 or 65 t GVW depending on configuration, and heavier project moves run under overweight permits with escort vehicles on approved routes. We manage the permit applications, escort booking and route survey as part of the move.

Loading and lift support

Many 4-axle loads are craned on rather than driven on. We coordinate the crane, certified riggers and banksmen, and the lashing plan as one job, with handover and inspection documented at both ends. Dispatch runs from Musaffah across all seven Emirates — send your load details through the quote form or call +971 58 227 4083 for a quote within 2 business hours.

Frequently asked questions

When should I choose a 4-axle over a 3-axle lowbed?

When the machine sits above the typical 3-axle range or when axle-load limits on the route demand the weight be spread further. The 4-axle unit typically handles 60–80 t depending on configuration. Send the load weight and dimensions and we will confirm which unit the move needs.

Can 60–80 t loads move legally on UAE roads?

Standard combinations are capped at 45, 56 or 65 t GVW depending on configuration, so heavier gross weights move under overweight permits, with escort vehicles and approved routing where required. This is routine for project cargo — we build the permit lead time into the transport plan.

Do you provide riggers and cranes for loading?

Yes. We supply cranes with certified riggers and banksmen from our crews, so the lift and the haul run as one coordinated job — certification documentation is available on request.

Request a Quote

Tell us what needs to move.

Send the cargo type, route and timeline — our dispatch desk answers within 2 hours during business hours.

+ Add load / equipment details